The BCF Managers can edit all issue properties the same way as in the Web application of BIMcollab Nexus.

Note that Area and Approval are not available when working in offline mode with the BCF Managers, as these are not supported by BCF. Milestones and deadlines are supported in BCF 2.1 only.
    • Related Articles

    • Can I start a project in BIMcollab Nexus from the BCF Manager?

      No, it is not possible to create a new online BIMcollab Nexus project directly from the BCF Managers. Log in to your BIMcollab Nexus to start a new project and add team members. Once the project is setup in BIMcollab Nexus, you can connect to it from ...
    • Offline workflow BCF Manager

      Creating, importing and exporting issues offline It is advised to always use the BCF Manager with an online workflow by connecting to BIMcollab Nexus. If this is not possible, you can create, import and export issues as BCF-files to exchange them ...
    • Why isn't the BCF Manager opening in my saved work environment?

      Currently, the BCF Manager cannot start automatically in a saved work environment. However, the location and size of the dialog are saved. You need to activate the BCF Manager from the menu manually to open it on the same location as before.
    • Use filtering to view specific issues in the BCF manager

      When you are connected to a project, BIMcollab allows you to filter issues based on issue properties such as Type, Milestone and 'Assigned to' and by using the Favorites bookmarks. Filtering Use the values from the dropdown or checkboxes to create a ...
    • Quick Start Guide BCF Manager Navisworks

      This Quick Start Guide describes the basic online workflow of the BCF Manager for Navisworks. It will get you up and running in no time. The BCF Manager for Navisworks is available for Navisworks Manage and Simulate. If you have not yet installed it, ...