Why is the BIMcollab Power BI Connector not certified?

Why is the BIMcollab Power BI Connector not certified?

Microsoft's certification program for Power BI connectors is restricted to more generic products who can demonstrate heavy data usage. BIMcollab does not yet meet that requirement.
BIMcollab customers who wish to see our connector certified can post their request on Microsoft’s Power BI Idea Forum.
    • Related Articles

    • Installation Guide for Power BI connector

      The Power BI connector for BIMcollab allows you to extract statistical data from BIMcollab Cloud in order to create fully customizable dashboards for your BIM team.  Note: The connector is currently in the process of being certified by Microsoft to ...
    • Power BI On-Premises Data Gateway Setup Guide for BIMcollab

      In order to allow Power BI to perform scheduled refreshes on a BIMcollab data set when working with an on-premises BIMcollab space, it is necessary to locally install and configure an on-premises data gateway.  Log into your online Power BI space and ...
    • How to synchronise your BIMcollab space with the BIMcollab Power BI Dashboard Template

      This article explains how to connect our Power BI Dashboard template file to your BIMcollab Cloud space. The template is an example. Once you have connected the template, you can adjust it to your needs and customise it any way you want. You can find ...
    • Connect to BIMcollab Cloud from Solibri

      Solibri is a very powerful and flexible BIM tool. Connected to BIMcollab Cloud it becomes part of an equally powerful Issue management ecosystem. Version 9.12 - The BCF Live connector The BCF Live connector is introduced in Solibri 9.12. Configure ...
    • Use Autodesk Docs with BIMcollab

      Autodesk Docs can be used in combination with BIMcollab in several ways: With the Autodesk Docs integration in BIMcollab Cloud As a Project folder in BIMcollab ZOOM In this article we will demonstrate how to setup and use these connections to use ...